Pictures and videos about important events
2019: the steam generator (SG, Dampferzeuger, Wärmetauscher) finished the final pressure test with air. After cleaning, maintenance it was delivered to the building site (Huaneng Shidaowan NPP ) in the first half year 2019. More to be seen at the „China-Log“ in the Archive (homepage, right, top)
31. Ocober 2018: the pebble-bed modular high-temperature gas-cooled reactor steam generator manufactured by Harbin Electric Group Heavy Equipment Co., Ltd. passed the acceptance test in Qinhuangdao, Hebei Province. It will be combined with the high-temperature gas-cooled reactor nuclear power plant – NPP – demonstration project